Yes I think you describe the basic system -
I believe Grants only is ML 31726. There is a bund around the site .
Note: there needs to be water flowing at discharge point to allow discharge
Refer moire detail here -
https://ntepa.nt.gov.au/__data/assets/pdf_file/0019/1128115/wdl248-lithium-development.PDF
There is a copy of stormwater management plan here - not sure if this "as approved"
https://ntepa.nt.gov.au/__data/assets/pdf_file/0006/1128381/water-management-plan-core-lithium.pdf
There was also an extraction license required to remove water from streams for processing
There is a lot of readingf that coulc be done but basically the point is there is a lot of engineering and science involved in the stormwater management. The performance of the sytem will be reliant on the engineering being sound.
- Forums
- ASX - By Stock
- Banter and general comments
Yes I think you describe the basic system - I believe Grants...
-
-
- There are more pages in this discussion • 15,217 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add CXO (ASX) to my watchlist
(20min delay)
|
|||||
Last
9.3¢ |
Change
-0.005(5.10%) |
Mkt cap ! $198.7M |
Open | High | Low | Value | Volume |
9.9¢ | 10.0¢ | 9.3¢ | $3.295M | 34.70M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
7 | 365887 | 9.3¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
9.4¢ | 883409 | 8 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
3 | 160000 | 0.093 |
8 | 228042 | 0.092 |
5 | 162000 | 0.091 |
15 | 566558 | 0.090 |
6 | 244301 | 0.089 |
Price($) | Vol. | No. |
---|---|---|
0.094 | 814846 | 6 |
0.096 | 114900 | 3 |
0.097 | 280988 | 2 |
0.099 | 510000 | 3 |
0.100 | 414411 | 8 |
Last trade - 16.10pm 28/06/2024 (20 minute delay) ? |
Featured News
CXO (ASX) Chart |
The Watchlist
LU7
LITHIUM UNIVERSE LIMITED
Alex Hanly, CEO
Alex Hanly
CEO
SPONSORED BY The Market Online