CXO 0.00% 10.0¢ core lithium ltd

Banter and general comments, page-24318

  1. 266 Posts.
    lightbulb Created with Sketch. 73
    Good analysis Whisky.

    I think we would need to factor in at least 3-4 months of the year as highly reduced production due to wet season weather. If we flood every year, which will be a given, then we need to factor in a slow period. This is factored into every mining and construction business in the NT.

    I would be working on full production of 40 weeks of the year at a max. If we are aiming for 180k tonne a year, we would need to consistantly mine 4500 tonne a week. Thayt nearly 1000 tonne a day on a 5 day working week.

    Do we think we are capable of those numbers? Since the first shipment, what is our stock pile looking like?

    We should be sitting on 50-60k tonne at the moment?
 
watchlist Created with Sketch. Add CXO (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.