CXO 3.09% 10.0¢ core lithium ltd

A simple DMS takes 8-12 months to build from scratch.Our...

  1. 2,389 Posts.
    lightbulb Created with Sketch. 3078
    A simple DMS takes 8-12 months to build from scratch.

    Our engineering team is on the ground already.

    Check my F.I.D. thread again for more information. lol.

    https://www.mining-technology.com/projects/bald-hill-lithium-tantalum-mine/

    "The pre-feasibility study (PFS) of Bald Hill was completed in July 2017 and construction works commenced in August 2017. Lithium concentrate production from the mine began in March 2018."
 
watchlist Created with Sketch. Add CXO (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.