CXO 10.3% 16.0¢ core lithium ltd

Banter and general comments, page-11592

  1. 183 Posts.
    lightbulb Created with Sketch. 31
    Here is news that confirm my opinion that batteries, accumulators are for short term supply ie UPS, EV"s, whilst accumulators like water dams are long term steady supply.Do not forget with heavy load of amps flowing either during charge or discharge, heat is generated.Therefore batteries out in the desert require air conditioning a drain on the supply source, not so for water dams, our natural battery :

    OVERVIEW The Victorian Big Battery is a 300 MW grid-scale battery storage project in Geelong, Australia which will store enough energy in reserve to power over one million Victorian homes for 1/2 an hour.The battery has a 250 MW grid service contract with AEMO under direction from the Victorian Government. It will support Victoria’s clean energy transition and secure reliable, affordable power for Victorians, helping the state meet its renewable energy target of 50% by 2030.Neoen is working together with Tesla and network partner AusNet Services to deliver this project, which is one of the largest batteries in the world.

    What is Victoria's population that are connected to the grid?
 
watchlist Created with Sketch. Add CXO (ASX) to my watchlist
(20min delay)
Last
16.0¢
Change
0.015(10.3%)
Mkt cap ! $341.9M
Open High Low Value Volume
14.5¢ 16.0¢ 14.5¢ $1.721M 11.21M

Buyers (Bids)

No. Vol. Price($)
10 540674 15.5¢
 

Sellers (Offers)

Price($) Vol. No.
16.0¢ 3936104 72
View Market Depth
Last trade - 16.10pm 14/05/2024 (20 minute delay) ?
Last
16.0¢
  Change
0.015 ( 7.74 %)
Open High Low Volume
14.8¢ 16.0¢ 14.5¢ 7268870
Last updated 15.59pm 14/05/2024 ?
CXO (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.