AKE 0.00% $9.83 allkem limited

Where did they get "50% Olaroz will be battery grade"? Stage 2...

  1. 4,178 Posts.
    lightbulb Created with Sketch. 783
    Where did they get "50% Olaroz will be battery grade"? Stage 2 is bigger than Stage 1, and none of it will be battery grade!

    From the ORE website:
    The only way to get to > 50% is to exclude the 10,000 tonnes from Stage 2 going to Naraha. Not to mention that the Stage 1 plant has never even managed to reach close to the 17,500 nameplate capacity of any grade, let alone battery grade from its purification circuit.
    Last edited by dyeman: 22/09/21
 
watchlist Created with Sketch. Add AKE (ASX) to my watchlist

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.