LKE 5.56% 3.8¢ lake resources n.l.

Battery day, page-21

  1. 16,779 Posts.
    lightbulb Created with Sketch. 2613
    NeoLithium
    • The economic analysis of the PFS is based on average lithium carbonate pricing over the life of mine is ~US$11,882/t
    *Battery grade lithium carbonate with 99.599% purity achieved.
    *evaporation pond model (non-ESG)

    LakeResources
    *US$11,000/t
    *99.961% purity
    *DLE - direct extraction model (ESG)

    Neo Lithium are developing evaporation pond operations, aim to produce 99.5% lithium carbonate, and are located at higher altitude than the Kachi project. High altitudes cause significant power de-rating in fossil fuel generators.

    ”According to the feasibility studies of six lithium developers, recovery rates vary from 52% (Neo Lithium) to 90% (Standard Lithium). The expected recovery rate at Kachi is 83%. Lake Resources is expected to recover a third more of their lithium resource than Neo Lithium will theirs.”

    *reference: page 10, Orior Cap. Ltd research

 
watchlist Created with Sketch. Add LKE (ASX) to my watchlist
(20min delay)
Last
3.8¢
Change
0.002(5.56%)
Mkt cap ! $63.40M
Open High Low Value Volume
3.7¢ 3.9¢ 3.7¢ $204.4K 5.401M

Buyers (Bids)

No. Vol. Price($)
7 497090 3.7¢
 

Sellers (Offers)

Price($) Vol. No.
3.8¢ 337803 1
View Market Depth
Last trade - 16.10pm 22/08/2024 (20 minute delay) ?
LKE (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.