E25 7.69% 30.0¢ element 25 limited

Battery Grade Mn, page-38

  1. 2,620 Posts.
    lightbulb Created with Sketch. 307
    @rajotel

    Agree with the $2 estimate, that would get them to around $200M MC. Increasing reserves and upping production should get them to $500M MC and they will be very interested in downstream processing to add more value. Lots of potential upside and not too much downside. MC currently half the NPV coming out of the PFS. Apart from execution risk (plant either doesn't turn up or doesn't work) I think the main risk is that the exchange rate moves in the wrong direction. DYOR and GLTAH

    BTW does anyone know how to fix/avoid the issue with HC not posting when you reply to a post?
 
watchlist Created with Sketch. Add E25 (ASX) to my watchlist
(20min delay)
Last
30.0¢
Change
-0.025(7.69%)
Mkt cap ! $65.25M
Open High Low Value Volume
32.0¢ 32.5¢ 30.0¢ $65.75K 208.6K

Buyers (Bids)

No. Vol. Price($)
4 21615 30.0¢
 

Sellers (Offers)

Price($) Vol. No.
31.0¢ 4040 1
View Market Depth
Last trade - 15.57pm 16/05/2024 (20 minute delay) ?
Last
31.0¢
  Change
-0.025 ( 0.00 %)
Open High Low Volume
32.0¢ 32.0¢ 31.0¢ 47736
Last updated 15.56pm 16/05/2024 ?
E25 (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.