If CGB application is approved for their Bauxite prospects EPM 18463 which is a total of 75 Blocks they must Relinquish 50% of their total holding, as a condition of Renewal of the EPM.
In my opinion they would need to get a wiggle on with the project before time runs out.
Cheers
Finn