The section of the video on the GPL's that was subsequently removed was only short and 'simulated'. I've attached what is now the 'amended' version of the video so you can get a feel of what the video was like. Start at 7:45 for Sam Bennett's commentary.
From memory, the video showed the channel from Pond 2 leading to a small culvert type pond close to the road crossing of the GPL's, from where the water/brine was pumped through a single pipe, over and alongside the road crossing and into a similar, small culvert type pond on the other side of the GPL's and Pond 3, before flowing down a similar open channel into Pond 3.
There were no specific details on the video and I've also subsequently reviewed all the Enviro documents to see if there are any 'plans or drawings' of this GPL crossing, to no avail.
My theory is that, because the GPL's are essentially a major piece of national infrastructure, its all been kept away from public eyes.
FYI.
- Forums
- ASX - By Stock
- BCI
- BCI Beautiful Compounding Investment
BCI Beautiful Compounding Investment, page-673
-
-
- There are more pages in this discussion • 712 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add BCI (ASX) to my watchlist
(20min delay)
|
|||||
Last
28.5¢ |
Change
0.000(0.00%) |
Mkt cap ! $822.1M |
Open | High | Low | Value | Volume |
29.0¢ | 29.0¢ | 28.3¢ | $98.97K | 346.6K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 32977 | 28.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
29.0¢ | 1127274 | 8 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
36 | 415037 | 0.280 |
7 | 171723 | 0.275 |
9 | 109733 | 0.270 |
6 | 327174 | 0.265 |
11 | 230087 | 0.260 |
Price($) | Vol. | No. |
---|---|---|
0.285 | 9289 | 3 |
0.290 | 1125494 | 6 |
0.295 | 4266 | 1 |
0.300 | 140947 | 3 |
0.305 | 332765 | 7 |
Last trade - 12.12pm 04/10/2024 (20 minute delay) ? |
Featured News
BCI (ASX) Chart |