BPT 0.00% $1.22 beach energy limited

Beach Energy Limited, page-385

  1. 3,985 Posts.
    lightbulb Created with Sketch. 373
    From the previous announcements by Beach, they are planning to put the new Kupe development well into production by end of March 2024. Time wise, connecting shouldn’t take long as drilling rig used is a jack up rig tied to Kupe gas platform. The NZO CEO said the new Kupe well will be put into production.
 
watchlist Created with Sketch. Add BPT (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.