BPT 4.00% $1.69 beach energy limited

24.5 mmboe production in FY 25 is easy. More likely between 32...

  1. 3,879 Posts.
    lightbulb Created with Sketch. 368
    24.5 mmboe production in FY 25 is easy. More likely between 32 to 35 MMboe. Otway Gas Plant
    alone will contribute 4 mmboe per year. Haven’t you worked out how much Waitsia LNG will add to BPT’s production. It is 600,000 boe per month. And Lang Lang gas plant will another 3 mmboe per year. Where the hell did you get 24.5 mmboe.?

    Abandonment expense does not kick in until the gas field life is about to come to an end. All of BPT producing field have at least 15 years of production left. In any case $1.7B is not as big as the value of BPT’s oil and gas reserves which is around 500 mmboe of 2P plus 2C. At an average selling price of $90 per boe, that would be worth $45B.
 
watchlist Created with Sketch. Add BPT (ASX) to my watchlist
(20min delay)
Last
$1.69
Change
0.065(4.00%)
Mkt cap ! $3.855B
Open High Low Value Volume
$1.64 $1.71 $1.64 $20.49M 12.15M

Buyers (Bids)

No. Vol. Price($)
6 119717 $1.69
 

Sellers (Offers)

Price($) Vol. No.
$1.70 30438 1
View Market Depth
Last trade - 16.10pm 10/05/2024 (20 minute delay) ?
Last
$1.70
  Change
0.065 ( 4.80 %)
Open High Low Volume
$1.64 $1.71 $1.64 3494628
Last updated 15.59pm 10/05/2024 ?
BPT (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.