STX 2.22% 23.0¢ strike energy limited

beach energy, page-220

  1. 1,836 Posts.
    lightbulb Created with Sketch. 2793
    It was an ultra high-speed construction in 194 days and a second FSRU (Floating Storage and Regasification Unit) will be in operation by eoy.

    The plan is to have not less than 7 FSRU operating by end of 2023 capable to process 1 TCF of gas per year (we had not one LNG-Import-Terminal in Germany at the beginning of this year…).

    65% of imported gas per year resp. 1.85 TCF/y was natural gas piped from Russia in the past (another example is Austria with 80% share) which must now be replaced by new import routes…

    Europe will be for years in a very strong demand for LNG…


 
watchlist Created with Sketch. Add STX (ASX) to my watchlist
(20min delay)
Last
23.0¢
Change
0.005(2.22%)
Mkt cap ! $659.0M
Open High Low Value Volume
22.5¢ 23.5¢ 22.5¢ $1.742M 7.573M

Buyers (Bids)

No. Vol. Price($)
13 1201102 22.5¢
 

Sellers (Offers)

Price($) Vol. No.
23.0¢ 124339 7
View Market Depth
Last trade - 16.10pm 11/11/2024 (20 minute delay) ?
STX (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.