There were no problems with the 5" choke. Also fracture placement was a mistake which they will learn from in PB#2. I would say they don't even have to fracture this and why would they take the risk if we have several mmcf/gas per day
"Fracture placement was determined using a series of staged isotopes added to different phases of the fracture. A SpectralogTM tracer survey tracks the isotope distribution revealing the placement of the fracture. The SpectralogTM in Paradox Basin #2 confirmed that the fracture travelled upwards nearly 300? behind the casing to 10,050? with the main placement occurring from 10,136? to 10,212? in a porous water bearing zone. The SpectralogTM shows negligible placement of the fracture in the Ismay Formation gas zone."
GDN Price at posting:
12.2¢ Sentiment: Buy Disclosure: Held