MAY 0.00% 3.2¢ melbana energy limited

beehive 1

  1. 12,843 Posts.
    lightbulb Created with Sketch. 725
    2.2. Timing
    The activity is scheduled to commence in late Q1 (March)/early Q2 (April) 2023. However, due to the
    uncertainty of MODU availability, drilling may commence at any time from March 2023.
    Drilling activities are estimated to take approximately 55 days, or up to approximately 90 days (if respud or mitigating problems is required, or a Drill Stem Test [DST] is performed). The drilling duration
    may be subject to change based on geological conditions and potential for operational challenges.
    Operations will be conducted 24 hours per day, seven days per week
    https://hotcopper.com.au/data/attachments/4820/4820832-898facea640093b41d3766763b6194bc.jpg
 
watchlist Created with Sketch. Add MAY (ASX) to my watchlist
(20min delay)
Last
3.2¢
Change
0.000(0.00%)
Mkt cap ! $107.8M
Open High Low Value Volume
3.0¢ 3.2¢ 3.0¢ $25.49K 821.9K

Buyers (Bids)

No. Vol. Price($)
3 114224 3.1¢
 

Sellers (Offers)

Price($) Vol. No.
3.2¢ 1202757 5
View Market Depth
Last trade - 16.10pm 11/11/2024 (20 minute delay) ?
MAY (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.