TOE 4.55% 34.5¢ toro energy limited

szaba,.. This is the biggest load of BS from management, and it...

  1. 9,517 Posts.
    lightbulb Created with Sketch. 1021
    szaba,.. This is the biggest load of BS from management, and it would take a fool to believe it.. If TOE had substantial commencement, it would mean the project is moving forward,... The deposit to shallow maybe they can builds the project from a helicopter... To funny hard to believe you fall for such BS azaba.
    \
    szaba comment,...it was discussed after the AGM that the nature of the depoisits is different which is why Toro could not go for the token loader removing overburden as substantial commencement - Toro ore is very very shallow depth and driving loaders around would expose and oxidise the ore body itself...
 
watchlist Created with Sketch. Add TOE (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.