TBN 6.90% 15.5¢ tamboran resources corporation

Tellurian scrapped plans to build a 625 ml 42 inch pipeline...

  1. 842 Posts.
    lightbulb Created with Sketch. 278
    Tellurian scrapped plans to build a 625 ml 42 inch pipeline budgeted to cost USD 4.2bn in 2020. Same required for Beetaloo to connect to the East Coast. AUD 10 billion looks about right, unless I’m missing something.

    https://hotcopper.com.au/data/attachments/6440/6440255-479fcba2323b269568dbc7467f93f6a6.jpg

 
watchlist Created with Sketch. Add TBN (ASX) to my watchlist
(20min delay)
Last
15.5¢
Change
0.010(6.90%)
Mkt cap ! $319.3M
Open High Low Value Volume
16.0¢ 16.0¢ 15.5¢ $41.01K 260.0K

Buyers (Bids)

No. Vol. Price($)
4 108844 15.5¢
 

Sellers (Offers)

Price($) Vol. No.
16.0¢ 185724 2
View Market Depth
Last trade - 16.10pm 06/09/2024 (20 minute delay) ?
TBN (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.