Drilling ahead 1555 meters 6.00am CST today will reach Namur 1670 meters.
20% share in this well.
Go STU.
After Arwon this one has settled down significantly.
Drilling ahead 1555 meters 6.00am CST today will reach Namur...
Add to My Watchlist
What is My Watchlist?