from last annoucment Tehnical Assessment of Kanatak Executive summary page 2 The Bellary Project appears to offer potential for minimum 200.000 tones of float ore
Bellary 220 hectares = 200.000 tones only float this is only at 1 m depth and JORC IS STILL NOT OUT
Add to My Watchlist
What is My Watchlist?