Sure, I care about the SP...but lol I dont care about them selling and dragging down the SP.
As long as the level of funding allows CFU to get on with it and actually convert some of their potential then I dont mind if they drag the SP down a few cents here and there. Even if at these sorts of levesl a few cents is all our SP is !
The funding for CFU to continue operations in the hope of growing operations is important for long terms sustainability of the business. If CFU can max out existing two furnaces then we are looking at over 3,500 units annually which could be between 40-55 million in revenue. I hope that level of revenue and forecast sales will allow for furether funding to facilitate expansion of manuf capacity
If this funding gets us to max out existing 1,800-2,000 capacity and need for another 5million capital spend then I am happy enough.
At around 10,000 units per year annual revenue could be 80million Euro.
Sure, I care about the SP...but lol I dont care about them...
Add to My Watchlist
What is My Watchlist?