Best time to invest in Graphite?, page-18

  1. 2,426 Posts.
    lightbulb Created with Sketch. 504
    Hi, check out BSM latest company presentations, many key operational quoted figures (6000tpa stage1 and 20.000tpa stage2, 94%+ purity, more than half the production as large flakes, 70% recovery rates targets, less than 500$ per tonne operating costs...etc). IMO they will prepare a detailed feasibility study for stage2 expansion. Stage1 was just low capex refurbishment (5 million$).
    Last edited by DoctorFouad: 23/04/18
 
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.