Hi, check out BSM latest company presentations, many key operational quoted figures (6000tpa stage1 and 20.000tpa stage2, 94%+ purity, more than half the production as large flakes, 70% recovery rates targets, less than 500$ per tonne operating costs...etc). IMO they will prepare a detailed feasibility study for stage2 expansion. Stage1 was just low capex refurbishment (5 million$).
- Forums
- Commodities
- Best time to invest in Graphite?
Hi, check out BSM latest company presentations, many key...
-
- There are more pages in this discussion • 8 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Featured News
The Watchlist
RDN
RAIDEN RESOURCES LIMITED
Dusko Ljubojevic, MD
Dusko Ljubojevic
MD
SPONSORED BY The Market Online