I think you are both missing the point. The recent drilling has ALWAYS BEEN and continues to be about getting PB#3 to flow gas at a consistent commercial rate with little water.
I don't care if PB#1 flows gas or not, or if they use it for re-injection. If the work contributes to solving gas flow problems then it's money well spent.
THE GAS IS THERE! If they can develop a prototype well which can be successfully replicated then we have a commercial gasfield.
Looking forward to next week.
GDN Price at posting:
11.0¢ Sentiment: ST Buy Disclosure: Held