BEZ 0.00% 9.1¢ besra gold inc.

BEZ A Golden Year in 2024, page-7

  1. 698 Posts.
    lightbulb Created with Sketch. 123
    gday tymmsy
    ,, my understanding is there wont be a second pilot plant , but a second crushing and loading facility at beckajang to transport material to jugan pp , however in time there will be 2 processing plants at seperate locations at the bau project , so as to process the different types of mineralisation at the bau project and minimise transport requirements

    that is at least how i interpreted the conversation i have had , I may of misunderstood the man but that is my understanding

    DYOR IMHO HODL
    https://hotcopper.com.au/data/attachments/6047/6047549-6f119154edb72438f83215ffd295b97b.jpg
 
watchlist Created with Sketch. Add BEZ (ASX) to my watchlist
(20min delay)
Last
9.1¢
Change
0.000(0.00%)
Mkt cap ! $38.04M
Open High Low Value Volume
9.2¢ 9.5¢ 9.1¢ $11.16K 120.2K

Buyers (Bids)

No. Vol. Price($)
1 184999 9.1¢
 

Sellers (Offers)

Price($) Vol. No.
9.5¢ 9253 1
View Market Depth
Last trade - 16.10pm 09/05/2024 (20 minute delay) ?
Last
9.2¢
  Change
0.000 ( 1.32 %)
Open High Low Volume
9.2¢ 9.5¢ 9.2¢ 80853
Last updated 15.45pm 09/05/2024 ?
BEZ (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.