BEZ 2.11% 9.3¢ besra gold inc.

BEZ A Golden Year in 2024, page-7

  1. 725 Posts.
    lightbulb Created with Sketch. 139
    gday tymmsy
    ,, my understanding is there wont be a second pilot plant , but a second crushing and loading facility at beckajang to transport material to jugan pp , however in time there will be 2 processing plants at seperate locations at the bau project , so as to process the different types of mineralisation at the bau project and minimise transport requirements

    that is at least how i interpreted the conversation i have had , I may of misunderstood the man but that is my understanding

    DYOR IMHO HODL
    https://hotcopper.com.au/data/attachments/6047/6047549-6f119154edb72438f83215ffd295b97b.jpg
 
watchlist Created with Sketch. Add BEZ (ASX) to my watchlist
(20min delay)
Last
9.3¢
Change
-0.002(2.11%)
Mkt cap ! $38.88M
Open High Low Value Volume
9.5¢ 9.7¢ 9.3¢ $53.82K 572.2K

Buyers (Bids)

No. Vol. Price($)
1 55014 9.3¢
 

Sellers (Offers)

Price($) Vol. No.
9.6¢ 20448 1
View Market Depth
Last trade - 13.49pm 13/06/2024 (20 minute delay) ?
Last
9.4¢
  Change
-0.002 ( 1.05 %)
Open High Low Volume
9.4¢ 9.7¢ 9.3¢ 138041
Last updated 15.06pm 13/06/2024 ?
BEZ (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.