I am curious as to how much more capital, shareholders (or non-holders) think will be required to complete the BFS. Specifically the quantum of the next capital raise.
I have a number in mind but I don't want to influence the thinking of others. Just on the back of an envelope I would say funds are needed for:
- further drilling to confirm the resource
- demonstration plant run
- pit optimization and plant size design for a smaller operation (at least initially)
- pipeline design and required facilities etc at Broken Hill
- rail to port option and back to transhipping by barge?
What size mine will the revised BFS aim for? I would suggest 5-8 Mtpa given the reduced capex expectations and the (suspected) limitations around rail availability.
Thoughts?
- Forums
- ASX - By Stock
- HIO
- BFS raise amount
BFS raise amount
-
-
- There are more pages in this discussion • 28 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add HIO (ASX) to my watchlist
(20min delay)
|
|||||
Last
2.3¢ |
Change
-0.001(4.17%) |
Mkt cap ! $23.37M |
Open | High | Low | Value | Volume |
2.3¢ | 2.3¢ | 2.3¢ | $4.446K | 193.2K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
5 | 209545 | 2.2¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
2.3¢ | 67300 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
5 | 209545 | 0.022 |
7 | 442000 | 0.021 |
15 | 2892825 | 0.020 |
3 | 123735 | 0.019 |
5 | 3297108 | 0.018 |
Price($) | Vol. | No. |
---|---|---|
0.023 | 67300 | 2 |
0.024 | 259874 | 2 |
0.025 | 291897 | 2 |
0.026 | 691826 | 1 |
0.028 | 746290 | 3 |
Last trade - 11.04am 04/10/2024 (20 minute delay) ? |
Featured News
HIO (ASX) Chart |