By the end of January 2011, a total of nine drill holes were completed within the initial drill phase. Two drill holes BLDD003 (TD 477m) and BLDD009 (TD 483m) still require further deepening due to inherent drill rig problems attaining the depth required. Both holes remain open in mineralisation and will be completed when a suitable rig is sourced. The final drill hole, BLDD010, had progressed to a depth of 407 metres and was continuing in mineralisation. Total meterage, inclusive of BLDD010, drilled to end of January is 3,381.1 metres
- Forums
- ASX - By Stock
- ANL
- bgf equities give burey a nice plug
bgf equities give burey a nice plug , page-3
Featured News
Add ANL (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.1¢ |
Change
0.000(0.00%) |
Mkt cap ! $23.22M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
ANL (ASX) Chart |
Day chart unavailable
The Watchlist
BTH
BIGTINCAN HOLDINGS LIMITED
David Keane, Co-Founder & CEO
David Keane
Co-Founder & CEO
Previous Video
Next Video
SPONSORED BY The Market Online