ANL 0.00% 0.1¢ amani gold limited

By the end of January 2011, a total of nine drill holes were...

  1. 1,571 Posts.
    By the end of January 2011, a total of nine drill holes were completed within the initial drill phase. Two drill holes BLDD003 (TD 477m) and BLDD009 (TD 483m) still require further deepening due to inherent drill rig problems attaining the depth required. Both holes remain open in mineralisation and will be completed when a suitable rig is sourced. The final drill hole, BLDD010, had progressed to a depth of 407 metres and was continuing in mineralisation. Total meterage, inclusive of BLDD010, drilled to end of January is 3,381.1 metres
 
watchlist Created with Sketch. Add ANL (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.