OEL 0.00% 1.2¢ otto energy limited

bhp billtion will assume operatorship sc-55, page-5

  1. 6,361 Posts.
    lightbulb Created with Sketch. 108
    Sandy,

    "condensate first then gas after".

    Normally (wet) gas is brought to the surface containing the condensate which then has to be separated through process.

    Interesting BHPP are going after gas (Cinco) with the first well...was not OEL's first or second choice...the additional energy will be welcome in the Pines (assuming success).

    Also interesting that BHPP are going after the gas when I assumed they were looking for an extension of the Sabah large field oil fairway...obviously Cinco "jumped off" the 3D!
 
watchlist Created with Sketch. Add OEL (ASX) to my watchlist
(20min delay)
Last
1.2¢
Change
0.000(0.00%)
Mkt cap ! $57.54M
Open High Low Value Volume
1.2¢ 1.2¢ 1.2¢ $5.382K 448.5K

Buyers (Bids)

No. Vol. Price($)
3 852085 1.2¢
 

Sellers (Offers)

Price($) Vol. No.
1.3¢ 2189015 6
View Market Depth
Last trade - 16.10pm 08/11/2024 (20 minute delay) ?
OEL (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.