Brazilian Ferrous: 4.6 Bt @ 33% Fe = approx. 1.52 Billion tonnes of Fe --> BHP will pay $6 billion = $3.94 per tonne.
Ferrous also needs to build own rail and port.
Accroding to MMX annual report, JHEP has 3.234 Bt @ 32.3% Fe = approx 1.044 tonnes of fe.
@ $3.94 per tonne x 1.044 = $4.11 Billion * 50% = $2.055
or $4.6 - $4.7 per share
Add to My Watchlist
What is My Watchlist?