AEV 0.00% 1.0¢ avenira limited

bhp road trains 800t

  1. 1,402 Posts.
    lightbulb Created with Sketch. 6
    bhp manganese production:
    Finished product is then stored in 800 tonne product bins prior to be loaded into road trains for transportation to the port of Milner Bay, 16 km north of the minesite. Here it is stored in one of two stockpile facilities with 400,000 and 60,000 tonne capacities

    I don't know how to post a picture, please see picture here.

    http://www.gemco.com.au/content/view/26/59/
 
watchlist Created with Sketch. Add AEV (ASX) to my watchlist
(20min delay)
Last
1.0¢
Change
0.000(0.00%)
Mkt cap ! $25.68M
Open High Low Value Volume
0.0¢ 0.0¢ 0.0¢ $0 0

Buyers (Bids)

No. Vol. Price($)
4 7213726 0.9¢
 

Sellers (Offers)

Price($) Vol. No.
1.0¢ 652728 2
View Market Depth
Last trade - 08.50am 12/11/2024 (20 minute delay) ?
AEV (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.