a couple of suggestions from my road engineer mate
MAK should be having informal talks with the NT dept of transport, to get a feel for costs (it's free). And do a photographic survey of the road prior to use. ie so they don't get stung for existing damage to the road, later on.
he had no issues with the feasibility
Max
- Forums
- ASX - By Stock
- AEV
- bhp road trains 800t
bhp road trains 800t, page-52
-
-
- There are more pages in this discussion • 8 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add AEV (ASX) to my watchlist
|
|||||
Last
0.9¢ |
Change
0.000(0.00%) |
Mkt cap ! $21.14M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
AEV (ASX) Chart |
Day chart unavailable
The Watchlist
MTL
MANTLE MINERALS LIMITED
Nick Poll, Executive Director
Nick Poll
Executive Director
SPONSORED BY The Market Online