Next ANN we need is to concentrate on the near term projects.
1/ Seymore; the drill program.
2/ Mauitouwadge; sampling and targeting results.
3/ JORC 10mt in both Lithium and Graphite to trigger a ML.
4/ Correct and smart CR or JV
If management can JORC these projects into production is say 12 months time Root Bay and Lakes will follow as CF from production increases
cheers.
- Forums
- ASX - By Stock
- Big Ann Root Lake
Next ANN we need is to concentrate on the near term projects. 1/...
-
- There are more pages in this discussion • 61 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add ADV (ASX) to my watchlist
(20min delay)
|
|||||
Last
14.0¢ |
Change
0.000(0.00%) |
Mkt cap ! $8.752M |
Open | High | Low | Value | Volume |
13.5¢ | 14.0¢ | 13.0¢ | $16.25K | 120.3K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 17385 | 13.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
14.0¢ | 44270 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 17385 | 0.135 |
2 | 46130 | 0.130 |
4 | 327649 | 0.125 |
4 | 126265 | 0.120 |
2 | 40867 | 0.115 |
Price($) | Vol. | No. |
---|---|---|
0.140 | 44270 | 2 |
0.145 | 65662 | 2 |
0.150 | 52174 | 2 |
0.155 | 51016 | 3 |
0.165 | 89743 | 2 |
Last trade - 16.10pm 27/09/2024 (20 minute delay) ? |
Featured News
ADV (ASX) Chart |