Very funny. I though it's other way around. What makes you think Codelco doesn't want LPI/MSB get the EIA?
We submitted the EIA since 2018. Codelco has the mandate to explore lithium so how long would you think it will takes them to be at our stage?
Why did they signed MOU with us? lol
back to your cave buddy!