Clever Newcrest will be using 58% of this farm
The 396MW project, near Yass in the NSW Southern Tablelands, and currently the biggest in the state, received the final 80m-long blade overnight – driven from the Port of Newcastle, owner Tilt Renewables said in a LinkedIn post.The completed wind farm will host sixty six 6MW V162 Vestas turbines, each with a tip height of 200 metres. The farm is anticipated to produce on average 1,188 gigawatt hours (GWh) of electricity a year.
- Forums
- ASX - By Stock
- $?Bill in a ? Life mine
Clever Newcrest will be using 58% of this farmThe 396MW project,...
-
- There are more pages in this discussion • 1,778 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add HCH (ASX) to my watchlist
|
|||||
Last
88.0¢ |
Change
-0.010(1.12%) |
Mkt cap ! $133.1M |
Open | High | Low | Value | Volume |
85.0¢ | 88.5¢ | 84.0¢ | $460.8K | 539.0K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 1140 | 87.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
88.0¢ | 39256 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 1140 | 0.875 |
1 | 563 | 0.870 |
1 | 211 | 0.850 |
2 | 1500 | 0.840 |
3 | 12455 | 0.810 |
Price($) | Vol. | No. |
---|---|---|
0.880 | 39256 | 1 |
0.900 | 463 | 1 |
0.905 | 500 | 1 |
0.910 | 6237 | 1 |
0.930 | 13614 | 1 |
Last trade - 16.10pm 02/08/2024 (20 minute delay) ? |
Featured News
HCH (ASX) Chart |