Given current spot prices:
- US$2.95/lb copper
- US$1,840/oz gold
Revenue expected to be approximately A$1.4 million to $1.8 million per annum and was intially based on 120,000 tonnes per annum and targeted annual head grade of 1.4% copper and 0.3g/t gold.
@1.4% copper and 0.3g/t gold
1t of ore with 1% Cu is worth(2.95/0.000453592)/100=$65.04
1t of ore with 1g/t Au is worth (1840/31.1035)=$59.161g/t
Au is equivalent to 59.16/65.04=0.91% Cu
Therefore CuEq= Cu + (0.91Au)
Therefore CuEq=1.4 + (0.91 × 0.3) = 1.67%
However, Initial production now targeting 1.8% copper and 0.5g/t gold head grade
@1.8% copper and 0.5g/t gold
Therefore CuEq= Cu + (0.91Au)
Therefore CuEq=1.8+ (0.91 × 0.5) = 2.26%
As a back of envelope calc with this increase in the CuEq this should realise an increase in revenue of:
2.26/1.67=1.35 x expected revenue = $2.35 million.
Now if production is doubled, it closer to 4.5 million
not a bad small scale cash cow!
- Forums
- ASX - By Stock
- HCH
- $?Bill in a ? Life mine
$?Bill in a ? Life mine, page-431
-
- There are more pages in this discussion • 27,257 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add HCH (ASX) to my watchlist
(20min delay)
|
|||||
Last
78.0¢ |
Change
-0.100(11.4%) |
Mkt cap ! $118.0M |
Open | High | Low | Value | Volume |
87.5¢ | 87.5¢ | 74.0¢ | $804.6K | 1.025M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 190311 | 78.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
88.0¢ | 41256 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 190311 | 0.780 |
3 | 215000 | 0.770 |
2 | 5100 | 0.760 |
4 | 7999 | 0.750 |
2 | 14508 | 0.745 |
Price($) | Vol. | No. |
---|---|---|
0.880 | 41256 | 2 |
0.890 | 20100 | 2 |
0.900 | 463 | 1 |
0.905 | 4400 | 2 |
0.910 | 6237 | 1 |
Last trade - 16.10pm 05/08/2024 (20 minute delay) ? |
Featured News
HCH (ASX) Chart |