HCH 1.22% 83.0¢ hot chili limited

$?Bill in a ? Life mine, page-5156

  1. 3,831 Posts.
    lightbulb Created with Sketch. 461
    At Cortadera, it takes 4 to 5 weeks for 1 deep DD hole (say 1,200m). Each rig is @24hours a day. My calcs has the depth per 12 hour shift @42metres?

    At Cortadera Nth, currently underway are 12 deep RC holes to be completed by late March (5 weeks). I assume RC drilling are limited to 500metres depth?

    @witt do you know hoe long "normal assay" possibly takes in Chile compared to elsewhere now it's "back to normal"?

 
watchlist Created with Sketch. Add HCH (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.