There is something I am unsure of. The previous report was put out by I think
H & S. What I would like to know is did H & S do this one.
Another thing I noticed was the grade capping
Copper 23% Max drilling on site 58%
Cobalt 5000ppm Max drilling on site 14 000 ppm
Gold 10 ppm Max drilling on site 63.2
Magnite 44% Max drilling on site 95%
Something else interesting was the new drilling
Diamond 116 holes for 19 544metres
RC 69 holes for 7 600metres
Looks good to me.
Add to My Watchlist
What is My Watchlist?