Black Swan Production Restart, page-3

  1. 9,757 Posts.
    lightbulb Created with Sketch. 4211
    SC revealed in the other unrelated thread -
    The water level has dramatically reduced and the pumps are visible on the google maps -

    Add a new EXHIBIT J = the ROM pad ore & stockpiles shown have been reworked & now have 2 blocks one which has been accessed via the road near the pit,

    the full time mine manger Caputo has been BUSY

    "That road has been there from start. Dewatering of Black Swan Open pit started in early 2020 as soon as Peter Harold took over as MD. Those Pictures are around 6 months old.
    ..
    Water from open pit is taken back to Dam near water treatment plant (West end of the plant, you can see piping and floating pumps) and probably reused for various purpose. I believe there is no water now in open pit (except fresh rain water as happens time to time). I reconfirmed that last night by filtering through Dozens of Google Earth pictures as taken time to time"

    "Looking at the pictures of Black Swan mine, they started draining the Black Swan Mines in March. I believe draining completed and refurbishing is in progress. ? (April 28th 2021)"
    ...
    ...

    ..
    ...
 
watchlist Created with Sketch. Add POS (ASX) to my watchlist
(20min delay)
Last
0.5¢
Change
0.000(0.00%)
Mkt cap ! $18.56M
Open High Low Value Volume
0.5¢ 0.5¢ 0.4¢ $19.81K 4.400M

Buyers (Bids)

No. Vol. Price($)
79 39712462 0.4¢
 

Sellers (Offers)

Price($) Vol. No.
0.5¢ 17579191 31
View Market Depth
Last trade - 16.10pm 26/06/2024 (20 minute delay) ?
POS (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.