Atom,
Judging from the colouring/lighting/shadows that aerial pic looks like the one taken on 21/04/21
More to the point, however, are you able to provide the source link for your image showing the proposed power plant for corroboration?
It's my understanding that the Black Swan project is already connected to the mains grid, so I'm interested to know the broader context of where that proposed power plant came from.
2014:
Actual components/features of the BS processing plant as at July, 2014:
Source: "Mt Windarra Trucking to Black Swan Engineering Study (Pre-Feasibility)" announcement (13/08/14, p.3).
2018:
Mid-2018 commentary about on-site BS power facilities:
Source: "Black Swan & Silver Swan Feasibility Study Supports Restart" announcement (18/07/18, p.5).
And
2021:
GR Engineering CAD drawing dated June, 2021:
Source: "Scoping Study Completed for Black Swan Processing Options" announcement (27/07/21, p.3).
- Forums
- ASX - By Stock
- POS
- Black Swan Production Restart
Black Swan Production Restart, page-62
-
- There are more pages in this discussion • 1,101 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add POS (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.6¢ |
Change
0.001(20.0%) |
Mkt cap ! $25.22M |
Open | High | Low | Value | Volume |
0.6¢ | 0.6¢ | 0.6¢ | $25.55K | 4.259M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
36 | 17019881 | 0.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
0.6¢ | 9886179 | 13 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
36 | 17019881 | 0.005 |
36 | 46085159 | 0.004 |
93 | 71409427 | 0.003 |
24 | 46177955 | 0.002 |
14 | 33678697 | 0.001 |
Price($) | Vol. | No. |
---|---|---|
0.006 | 8786179 | 10 |
0.007 | 4511001 | 13 |
0.008 | 4220885 | 9 |
0.009 | 1248928 | 5 |
0.010 | 5095743 | 5 |
Last trade - 16.10pm 18/10/2024 (20 minute delay) ? |
Featured News
POS (ASX) Chart |