General1952
The Songa Mercur rig is contracted to drill Block 120. If this is correct we could be drilling 2 block in July. BOOM
Good luck all.
- Forums
- ASX - By Stock
- block 105 site selection
General1952The Songa Mercur rig is contracted to drill Block...
-
- There are more pages in this discussion • 10 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)