DXI 0.00% $2.78 dexus industria reit.

block a-3 and a-4 wells placed on production t, page-2

  1. 1,655 Posts.
    Previous results suggest a reversal of fortunes for the two Bakers.

    However, Baker 1 was never completed and the results reflect flow from a damaged well (there is no mention that the blockage has been cured or circumvented).

    Baker 2 is a massive result. It was originally reported as being 1,500 ft. That makes the production rate 54 boepd / 100 ft. That is twice the rate achieved by Kunde 3 and very nearly twice the rate achieved from the bottom 1,500 section of Kowalik first reported.

    If (BIG IF) that kind of flow can be replicated for Block B wells in sections drilled through natural fractures, we would see significant flows from Kowalik and Weston (which seemed to be flaring as they drilled a bit like Baker 2).
 
watchlist Created with Sketch. Add DXI (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.