CCC 0.00% 0.1¢ continental coal limited

Eskom basically pay in heat value terms, ie Rxx per gigajoule,...

  1. 1,113 Posts.
    Eskom basically pay in heat value terms, ie Rxx per gigajoule, therefore the low quality 20 Mj/kg coals get less than say a 24 Mj/kg coal.

    Export coal are in the order of 26 to 27 mj/kg and are actually too good for eskom to burn.

    Eskom also factor in the cost of transport form the mine site to the power station.
 
watchlist Created with Sketch. Add CCC (ASX) to my watchlist

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.