Dean-1
At 06:00 today, the Dean-1 well was at a depth of 694m preparing to install blow out prevention
equipment in preparation for drilling ahead after successfully running and cementing in place the
13-3/8” intermediate casing. The well is expected to resume drilling operations later today.
People dont seem too happy with this report. What am I missing?
Dean-1At 06:00 today, the Dean-1 well was at a depth of 694m...
Add to My Watchlist
What is My Watchlist?