back to the topic of the thread heading...
IK was expecting the JORC before the end of July and if this isn't announced tomorrow it will be 2 weeks overdue. Considering the 15 drill tests produced better than expected results, why the delay? Who else is involved in this process that may be causing the hold up?
- Forums
- ASX - By Stock
- bm jorc due anyday :0)
back to the topic of the thread heading... IK was expecting the...
-
- There are more pages in this discussion • 14 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)