ROC rocketboots limited

Extract from BPT quarterly Report:Gippsland Basin offshore...

  1. 2,251 Posts.
    lightbulb Created with Sketch. 225
    Extract from BPT quarterly Report:

    Gippsland Basin offshore Victoria

    BMG Project (Beach 30%)

    The mandatory shut down to allow for dry dock inspection, repairs and upgrades to the Crystal Ocean and Basker Spirit, was completed the during the quarter. However, after leaving dry dock, a bow thruster on the Crystal Ocean failed during sea trials and continues to be inoperative. The failure of this thruster will increase weather related downtime until repaired. A short dry dock repair is planned for late February and will require an additional shut down totalling 20 days.

    Production during the quarter totalled 120,000 barrels (36,000 barrels net to Beach), averaging 3,250 bopd (975 bopd net to Beach) once production was reinstated after the Crystal Ocean returned from dry dock in late November.

    Basker-7 is online and currently contributing approximately 500 bopd to production for the field. Optimisation of its production, together with Basker-2 and -3 through the subsea manifold is continuing.

    Dispute with BW Offshore

    Litigation of the dispute is progressing in the Federal Court.


    Regards

    SP
 
Add to My Watchlist
What is My Watchlist?
A personalised tool to help users track selected stocks. Delivering real-time notifications on price updates, announcements, and performance stats on each to help make informed investment decisions.
(20min delay)
Last
11.0¢
Change
0.005(4.76%)
Mkt cap ! $18.84M
Open High Low Value Volume
11.0¢ 11.5¢ 11.0¢ $11.14K 101.2K

Buyers (Bids)

No. Vol. Price($)
4 128332 10.5¢
 

Sellers (Offers)

Price($) Vol. No.
11.5¢ 94392 1
View Market Depth
Last trade - 15.20pm 12/09/2025 (20 minute delay) ?
ROC (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.