I hear your frustrations with the missed deadlines.
I myself was very vocal about some of them as well as the performance rights.
Its very easy to judge from the outside and hindsight is such a wonderful thing.
As for reversing the sp slide,
i believe it can be done a different way.
1. updated drilling results as well as improved metal recoveries should bring about an updates MRE, improved project economics and mine life.
2. Assays from the keep seismic target will possibly be much higher grade than the Sorby hills deposit.
3. A sell down of Manbarrum or a section of Manbarrum to raise cash to progress Manbarrum and drill out the seismic target.
I personally don't think releasing offtakes now will benefit anything.
- Forums
- ASX - By Stock
- BML Chart
I hear your frustrations with the missed deadlines.I myself was...
- There are more pages in this discussion • 334 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add BML (ASX) to my watchlist
(20min delay)
|
|||||
Last
11.0¢ |
Change
0.000(0.00%) |
Mkt cap ! $25.67M |
Open | High | Low | Value | Volume |
11.0¢ | 11.0¢ | 11.0¢ | $24.72K | 224.7K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
14 | 676600 | 10.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
11.5¢ | 55076 | 3 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
14 | 676600 | 0.105 |
26 | 992321 | 0.100 |
1 | 5112 | 0.098 |
1 | 5155 | 0.097 |
3 | 120000 | 0.096 |
Price($) | Vol. | No. |
---|---|---|
0.115 | 55076 | 3 |
0.120 | 225875 | 3 |
0.125 | 70000 | 2 |
0.130 | 324000 | 3 |
0.135 | 72157 | 3 |
Last trade - 15.59pm 13/06/2024 (20 minute delay) ? |
|
|||||
Last
11.0¢ |
  |
Change
0.000 ( 0.00 %) |
|||
Open | High | Low | Volume | ||
11.0¢ | 11.0¢ | 11.0¢ | 95000 | ||
Last updated 15.39pm 13/06/2024 ? |
Featured News
BML (ASX) Chart |