AVM advance metals limited

re: re:bmo conf..bt live A quick snapshot of what I scribbled...

  1. 11,416 Posts.
    lightbulb Created with Sketch. 2657
    re: re:bmo conf..bt live A quick snapshot of what I scribbled down was-
    1)Not going underground for another 2 to 2.5yrs - end of 2007? Open Pit to go to 130metres by then.
    2)Six drill rigs operating within a month with two already operatiing at Kinsevere.
    3)US$12mil CapEx required for the Mutoshi coarse rejects project to be operational by Nov this year.
    4)Have already done 2,000metres of RC drilling down to 40metres at Kinsevere and now taking that drilling down to 100metres.
    5)Kinsevere will initially be heap leach operation then SXEW operation and then eventually cathode copper will be produced.Total CapEx required of US$30mil
    6)Will be producing 45000 tonnes/pa of copper by the end of this year with the two starter projects in production.
    7) World Bank Public Risk insurance covered by April -meaning reduced premiums for this insurance.
    8) 600 people currently working at Dikulushi.
 
Add to My Watchlist
What is My Watchlist?
A personalised tool to help users track selected stocks. Delivering real-time notifications on price updates, announcements, and performance stats on each to help make informed investment decisions.
(20min delay)
Last
4.9¢
Change
0.000(0.00%)
Mkt cap ! $12.98M
Open High Low Value Volume
4.8¢ 4.9¢ 4.6¢ $191.1K 4.012M

Buyers (Bids)

No. Vol. Price($)
1 41666 4.8¢
 

Sellers (Offers)

Price($) Vol. No.
4.9¢ 329000 1
View Market Depth
Last trade - 14.03pm 30/06/2025 (20 minute delay) ?
AVM (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.