RR who is currently presenting at the AGM said all but 3 turbines will be fully operational by end of Nov. Last 3 have blade defects so won't be online until late Dec.
- Forums
- ASX - By Stock
- IFN
- Bodangora First Power Generation
Bodangora First Power Generation, page-19
-
-
- There are more pages in this discussion • 13 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)