Originally posted by ram01
↑
Thanks Wes ..
A great piece of first hand info.
5 tonne a bucket load means a possible 10 tonne a round trip for 2 boggers so at 20 t /hr efficient crushing means 2 round trips per hour . If they are picking up stockpiled underground high grade ore from the 4 or 5 places that they have said they are mining they may be able to get 30 t out per hour . the crusher is being utilised atm for 6 hour s a day then if the ore transportation is 8 t0 10 hours a day then the feed to the crusher is well ahead .
This is of course back of the napkin math but it opens up possibilities with an efficient mine plan .
Thanks again and I hope you make a Motza
Expand
Exciting times. The back of the napkin numbers are moving quickly. The scales may tip the other way once they go to 2 shifts and the second 25t mill is commissioned next month.