Released to ASX today:
Holes A and B at Borroloola completed. Chalcopyrite mineralisation intersected in both holes indicating a possible strike length of >1.5km for this system. • Drilling scheduled to commence at Yannarie in mid-November.
- Forums
- ASX - By Stock
- SFR
- boroloola and yannerie drilling update
boroloola and yannerie drilling update
-
- There are more pages in this discussion • 1 more message in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add SFR (ASX) to my watchlist
|
|||||
Last
$8.03 |
Change
0.220(2.82%) |
Mkt cap ! $3.672B |
Open | High | Low | Value | Volume |
$8.09 | $8.19 | $7.96 | $18.47M | 2.290M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 648 | $8.02 |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
$8.06 | 3000 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 994 | 8.010 |
1 | 250 | 8.000 |
1 | 1800 | 7.920 |
1 | 6000 | 7.910 |
1 | 1000 | 7.850 |
Price($) | Vol. | No. |
---|---|---|
8.060 | 3000 | 1 |
8.150 | 8353 | 1 |
8.180 | 1450 | 1 |
8.190 | 1248 | 1 |
8.200 | 500 | 1 |
Last trade - 16.10pm 09/08/2024 (20 minute delay) ? |
Featured News
SFR (ASX) Chart |